Removal, disconnection, and modification of existing plumbing systems as part of commercial renovations, remodels, and facility improvements.
Demolition prepares existing spaces for new plumbing layouts, piping, equipment, and fixtures while coordinating removal with the surrounding building systems.
Installation of underground waste and water piping during the first stages of commercial construction or renovation.
This work establishes the below-grade plumbing infrastructure and necessary connection points before concrete slabs and other building components are installed.
Installation of valves and other plumbing components as construction progresses and walls, framing, and equipment locations are established.
This phase can include valve installation, tub sets, backing for final fixtures, and plumbing coordination with framing to prepare the system for final connections and fixture installation.
Completion of the visible and final components of a commercial plumbing system after major construction and finish work is complete.
Trim-out includes installing and connecting sinks, tubs, showers, urinals, water heaters, water coolers, bottle fillers, and other plumbing fixtures and finishing components so the system is ready for final operation.